Commercial Office Fit-Out - Newgate Street, London

Client: Main Contractor, Confidential

Size: 90,000sqft (approx.)

Duration: 01/09/2023 - 29/03/2024

In a highly coveted spot near the iconic St Paul’s Cathedral, Sygna was onboarded onto a state-of-the-art office fit-out by the main contractor on the project. Scaling at approximately 90,000 sqft across three floors, this project has certainly set a standard for commercial interiors. With what can only be described as a sleek, spa-like comfort, underpinned by professionalism and sustainability, this office is brimming with fully functioning, purpose-built workspaces. The amenities include individual booths, collaborative conference rooms and an impressive IT infrastructure, while also accommodating each employee, with multiple kitchen spaces (catered and non-catered), ‘quiet’ studios, prayer rooms, parent rooms, and an impressive terrace overlooking the City’s business district. Aiming to achieve an “Excellent” BREEAM status and a WELL Gold Specification, this project was one that Sygna was buzzing to be a part of.

“Life is easier with Sygna”

Sygna was appointed by the main contractor to provide CxM services, which included the Commissioning Management of MEP services such as LV systems, Ventilation, BMS, Lighting Control, CHW, Life Safety and BMS. Sygna also oversaw the stand-alone testing of these services and managed the integration to the base build system. Utilising our team’s expertise, our other responsibilities included:

  • Liaising with trades and main contractor (client) to notify of project progress and notable blockers.

  • Reviewing and tracking test documentation to meet key deadlines including room-ready dates.

  • Producing separate trackers for sectional handover to streamline the process.

  • Publication of a Cause-and-Effect script and Integrated System Testing script.

  • Overseeing testing & integration to Landlord systems.

Commissioning Management services provide invaluable support to a project, and Sygna takes pride in acting as a linchpin in project coordination, compliance, and collaboration. Sygna further contributed to the project by:

  • Conducting workshops with the construction team, to align on Cx programme activities and highlight pinch points, covering every process, big or small.”

  • Holding MAP days with trade contractors, to review interfacing activities and highlight potential pitfalls.

  • Reviewing of base build commissioning documents & Validation reports to provide further guidance on inherited services.

  • Overseeing system integration to the Landlord.

  • Early completion of deliverables to the contractor & trades for review & buy-in.

  • Allowing Stage Four sectional testing to begin early.

We also integrated our bespoke, automated tracking and reporting tools in this project, ensuring that information was easily accessible both upstream and downstream, with instant updates on all trades at every level available. This meant that our team could spend more time on-site, applying their knowledge and supporting different areas every day.

 

“Sygna stands out from other commissioning companies”

The value of having our team on-site was highlighted by our client reporting that “Sygna stands out from other commissioning companies”, by doing everything expected of them, and if an obstacle arose, such as the speed of the job or any technical requirements, Sygna adapted.” Our client also stressed the importance of having our commissioning services begin early in the project phase, explaining how this “helped fast-track the project, prevent commissioning delays, and improve client trust.”

We understand that when you choose Sygna to support your project for Contractor-side commissioning services, you are also trusting us with your reputation as a project provider. Described as “very talented, very eager and very integrated”, Sygna is dedicated to providing the best customer service to its clients, and so we always ensure that our commissioning managers are ready to take one each project. Freddie Purnell, our Lead Commissioning Manager on the project, did a fantastic job collaborating with the client and other trades, to ensure that Sygna delivered our client’s expectations.

“[This] was a great [project] to be part of, the site team had a good blend of construction and service knowledge working seamlessly together. With the added benefit of being engaged in the early stages, Sygna was able to assist with design issues that could affect future testing, as well as driving the importance of the commissioning process and getting the main contractor & trades to buy into our process.

The project was very fast-paced, with a short programme duration. Being in a building with multiple fit-outs being undertaken came with a number of challenges, which as a team, Sygna & the main contractor were able to navigate together, preventing major disruption to the testing process and offering the end user a fully tested & functional space.” – Freddie Purnell, Lead Commissioning Manager

Overall, this was truly a fantastic project to have been a part of. We are proud to have received such glowing feedback from our client, especially on the wonderful final note of:

“I think Sygna is the best in the UK”

Previous
Previous

Office Fit-Out - One Portsoken Street, London

Next
Next

Commercial Fit-Out, 40 Bank Street